Q: Will I be notified before construction begins?
A: Yes. There will be multiple communication efforts between design and the beginning of construction. Information will be available on the WVWA webpage and also provided through the automated phone system.
Q: Will my driveway be accessible during construction?
A: Yes. We will be providing access to driveways through the duration of the project. We will work with property owners and businesses to coordinate the work schedule to meet your travel needs.
Q: Will I lose water service during the construction?
A: Our plan includes installation of the new waterline while leaving the existing system in place. There may be short periods of service interruption in the event that the existing system is damaged, however, providing continuous water service throughout the construction phase is our goal. You will be notified of any planned or unplanned disruption in service via the automated phone system.
Q: Will I have access to the new waterline immediately?
A: The waterline will need to be fully installed, tested for leaks and quality, and flushed/sampled for Bac-T prior to switching the customers over from the old waterlines to the new waterlines. Communication will be provided prior to switching customers, as there will be a short disruption in service during the switch.
Q: Is there anything that I will see that could be confusing?
A: During construction, a new service line will be installed next to your existing meter. You will still be on the current system until the project is fully complete, so don’t be frustrated if your flow doesn’t change once you see a service line has been constructed. In some cases, there can be 30-60 days between service install and the switch to a new system.
Q: How will restoration / repairing damage to grass be handled?
A: Any alteration to your property will be restored as soon as possible based on the project schedule. There will be WVWA representatives on site to communicate with property owners about when the restoration will occur and to address any questions that you may have about the project. Contact information for WVWA representatives will be communicated before work begins.
Q: Will travel be impacted (cars and or school buses)?
A: A Maintenance of Traffic plan will be developed by WVWA to provide constant travel access in the project area throughout the duration of the project. Maintaining school bus pick-up and drop-off routes and schedules will be a priority.